Network Dashboard
SolarProof Certified Installer Network
Mar 18, 2026 Β· 10:23 AM
PD
Certified Installers
142
β 12 this monthActive Projects
87
β 23% vs last monthAvg Trust Score
89.4
β 1.2 ptsVerification Match Rate
96.1%
β StableCompliance Alerts 5
View All βπ©
Estimate Mismatch β Southwest Solar Co.
Proposal claims 18,200 kWh/yr but Google Solar API estimates 12,800 kWh/yr for this address. 42% variance β exceeds 15% threshold.
π©
Estimate Mismatch β Cactus Energy LLC
Savings estimate of $3,200/yr vs Google estimate of $1,950/yr. 64% variance. Auto-blocked pending review.
β οΈ
License Expiring β ArizonaStar Energy
AZ ROC license #418723 expires in 14 days. Installer notified. Will be suspended if not renewed.
β οΈ
Low Review Score β Sonoran Energy Co.
Trust score dropped below 85 threshold (now 82.4). Two 1-star reviews in past week. Performance review triggered.
βΉοΈ
New Application β Pinnacle Solar AZ
New installer application received. Background check initiated. License verification pending.
Active Pipeline
View All 87 β| Homeowner | Location | Installer | System | Status | Verified |
|---|---|---|---|---|---|
| Sarah Johnson | Phoenix, AZ | Rodriguez Solar | 8.0 kW | Permitting | β 97% |
| James Chen | Scottsdale, AZ | Desert Sun Electric | 10.4 kW | Installing | β 99% |
| Maria Gonzalez | Tempe, AZ | Valley Power Solar | 6.8 kW | Contract | β 95% |
| Robert Kim | Mesa, AZ | Rodriguez Solar | 12.0 kW | Financing | β 94% |
| Lisa Park | Chandler, AZ | ArizonaStar Energy | 7.2 kW | Quote | β 78% |
Satellite Verification
Proposals verified (MTD)124
Avg estimate match96.1%
Auto-approved (within 15%)118
Flagged for review4
Auto-blocked (>30% variance)2
Installs satellite-confirmed16,342
Top Installers
View All β1
MR
Rodriguez Solar Works
342 installs Β· β
4.9
96
β 2
2
DS
Desert Sun Electric
278 installs Β· β
4.8
93
β 1
3
VP
Valley Power Solar
198 installs Β· β
4.7
91
β 0
4
AS
ArizonaStar Energy
156 installs Β· β
4.6
88
β 3
5
SE
Sonoran Energy Co.
112 installs Β· β
4.5
82
β 3